Premier American Uranium: New Cebolleta Work Program Looks to Optimize PEA Economics

DISCLAIMER: Any written content contained herein should be viewed strictly as analysis & opinion and not in any way as investment advice. Visitors to this site are encouraged to conduct their own due diligence. As a Research Spotlight product, HoldCo Markets has received financial compensation for the written content and analysis below. Please read the full disclaimer here: holdcomarkets.com/disclaimer


As announced last Friday (March 27), Premier American Uranium (PUR) released the details for a sampling and test program for the Cebolleta Project, located in New Mexico.  The multi-phased program has already commenced earlier in March. The goal of the current work program is ultimately to target refinements to the process assumptions as outlined in the 2025 Preliminary Economic Assessment (PEA). At an estimated cost of $1.1M, the sampling program and the metallurgical test program is designed to investigate and maximize the metallurgical recovery of uranium from the heap leach process. Recall that metallurgical recovery was previously identified in the PEA as a key sensitivity for the overall project value.

We maintain our 0.75x NPV8% derived valuation for Cebolleta while factoring in the latest corporate adjustments (among others, a recently completed private placement for C$15.0M gross). Our resulting 12-month price objective is adjusted to C$1.55 per share, from C$1.73 previously. Given a current market related share decline of nearly -30% over the last month, our price objective equates to upside of +172% from the March 27 close. Shares of Premier American Uranium currently trade at a P/NAV of 0.28x, or given the recent financing, at ~0.33x cash/mcap. 



2026 CEBOLLETA WORK PROGRAM

 

The work program will focus on bulk sampling, targeted drilling, and comprehensive metallurgical testing aimed at optimizing the heap leach recovery assumptions of the 2025 PEA. The sampling program is already underway- earlier in March bulk samples were hand collected (and have since been delivered to the laboratory) from mineralized surface exposures, providing test material representative of open pit mining at the St. Anthony Mine. Between late April and June drilling will commence. Core from up to 16 new drill holes are expected to be completed under the existing drilling permits will provide test material representative of underground mining at Sohio Areas I, II and III. As per metallurgical testing, a 42-week laboratory testing campaign is expected to commence in May. The program will include mineralogical characterization, bottle roll recovery testing, and long-term column leach tests to simulate heap leaching. Additionally, column leach tests will examine the efficacy of multiple oxidants, lixiviants, and application rates with the goal of optimizing heap-leach uranium recovery and informing key assumptions for future economic studies. Results from the metallurgical program are expected to be incorporated into an updated PEA for the Project with completion targeted for Q1/2027.


2025 CEBOLLETA PEA HIGHLIGHTS STRONG LEVERAGE TO LT URANIUM PRICING

 

The October 2025 released PEA illustrated a LOM operation spanning 13 years and averaging the production of 1.4M lbs U3O8 per year. Specifically, the PEA contemplated a two-year underground pre-production period and a 13-year active mine life comprised of underground and open pit mining across seven mining zones (St. Anthony, Willie P, and Areas I, II, III, IV, and V). The primary mining methods expected to be employed at Cebolleta will be open pit (St. Anthony Area) and room and pillar (Areas I, II, III, IV, V and Willie P, St. Anthony North and South Zones).



According to the PEA, the underground mining areas will be accessed by a 3,500-ft long adit decline starting near the heap pad location for Area III, with a 2,500-ft long extension of this decline to access Area II. There will be a second access to the underground mining at Area I and Willie P, which will be a 930-ft long adit starting at a location in the northwest corner of the St. Anthony open pit. These two underground accesses will be connected by a 3,800-ft long drift. A minimum mining thickness of six feet was applied to two-foot-thick mining blocks. Over the LOM, mining is expected to supply total process feed of 10.46 Mst with an average head grade of 0.11% eU3O8. Mining rates are anticipated to be 1,079 short tons per day (stpd) from underground and 1,982 stpd from open pit operations.


CEBOLLETA PEA ECONOMICS

 

Factoring in total capital of $206M (development capital, sustaining capital and reclamation) and an average operating cost of $41.60 per LOM, using a $90.00 per lb LT uranium price deck, the PEA calculated an after-tax NPV8% of $83.8M and an after-tax IRR of 17.70%.



Note that the Project is very leveraged to the underlying LT uranium price - the Project after-tax NPV8% increases by +83% when going from $90 per lb to $100 per lb LT. The PEA also set the framework with various recommendations which could potentially increase the Project returns (the execution of advanced metallurgical work, leach testing and confirmation drilling, among others). Metallurgical recovery was previously identified as one of the key sensitivities for the overall project value. Specifically, sensitivity analysis in the 2025 PEA indicated that increasing recovery to 90% could increase base-case after-tax project NAV8% by approximately 90%, from $84M to $159M.

As per our own current estimates, we remain on the more conservative side with a modeled $43.00 per lb in average LOM operating costs while also following a similar development schedule.



CEBOLLETA: AMONG ONE OF THE LARGEST US UNDEVELOPPED URANIUM DEPOSITS


An updated MRE (effective date May 14, 2025) released in conjunction with the PEA also confirmed Cebolleta as one of the largest undeveloped uranium deposits located within the United States. Given an Indicated mineral resource of 20.3M lbs eU3O8 along with an Inferred resource estimate of 7.0M lbs eU3O8, the Project ranks near the upper end in terms of global resource, relative to other domestic deposits.



VALUATION

 

The goal of the current work program is ultimately to target refinements to the process assumptions as outlined in the 2025 PEA. At an estimated cost of $1.1M, the sampling program and the metallurgical test program is designed to investigate and maximize the metallurgical recovery of uranium from the heap leach process. Recall that metallurgical recovery was previously identified in the PEA as a key sensitivity for the overall project value. We maintain our $80 per lb LT, 0.75x NPV8% derived valuation for Cebolleta while factoring in the latest corporate adjustments (among others, a recently completed private placement for C$15.0M gross). Our resulting 12-month price objective is adjusted to C$1.55 per share, from C$1.73 previously. Given a current market related share decline of nearly -30% over the last month, our price objective equates to upside of +172% from the March 27 close. Shares of Premier American Uranium currently trade at a P/NAV of 0.28x, or given the recent financing, at ~0.33x cash/mcap.




 
 